Barnwell Water Treatment Plant

Project Image
Project Size2, 870 SqFt
LocationBarnwell, AB
Year of Work2006
This 2870 sq.ft. Pre-Engineered Behlen Corr Span Dub’L steel building system was constructed in 2006 for the Town of Barnwell for their Water Treatment Plant.
Industrial;Institutional;Steel;Water Treatment

Project Gallery