Progressive Waste

Completed on time and on budget, this state of the art, heavy truck maintenance facility features all of the required amenities of a standalone facility however it compliments an existing recycling building. The building is designed to be compact and highly efficient due to the high site traffic volumes and reduced land area. This facility was the first of its kind but has now been replicated in several locations by the owner which speaks to its well-planned design and functionality.

Completed on time and on budget, this state of the art, heavy truck maintenance facility features all of the required amenities of a standalone facility however it compliments an existing recycling building. The building is designed to be compact and highly efficient due to the high site traffic vol...

Viterra Tempest – Red Lintel Cleaning Facility

Located along highway 3 east of Coaldale, Alberta, this project was completed as a supply and erect contract.
Included within this was not only the pre-engineered building but also two pre-engineered structural towers. The building expansion accommodates processing, cleaning and conveyance equipment whereas the towers support bulk storage and unloading equipment. Completed on time and on budget, this project is an example of the versatility that pre-engineered steel can provide to any industrial project
Located along highway 3 east of Coaldale, Alberta, this project was completed as a supply and erect contract.
Included within this was not only the pre-engineered building but also two pre-engineered structural towers. The building expansion accommodates processing, cleaning and conveyance eq...

Dinosaur Provincial Park Central Hall

The central hall is the hub of staff activities in Dinosaur Provincial Park. It features an assembly area that can be used for activities or as a dining hall with a break room that has a 14’ high partition curtain to separate the areas for meetings. The building also has a large kitchen area with commercial stainless steel appliances and a pass through with a roll shutter. The assembly and deck area have scissor trusses to give a more open feeling and has multiple large windows facing the picturesque river and river hills beyond. The building was built as a wood framed structure with exterior material colors chosen to blend in with the...
The central hall is the hub of staff activities in Dinosaur Provincial Park. It features an assembly area that can be used for activities or as a dining hall with a break room that has a 14’ high partition curtain to separate the areas for meetings. The building also has a large kitchen area w...

Sonic Oilfield

Mid-West Design & Construction Ltd. was contracted by Sonic Oilfield to build a shop in Kindersley, Sk. We built this project as a Design Build for a basic shop to store tools and equipment in, the basic design was a 60’ x 80’ x 18’6” pre-engineered building which was increased to 80’ x 80’ x 18’6” with in-slab heat and an end wall with a pre-framed
opening for future expansion

Mid-West Design & Construction Ltd. was contracted by Sonic Oilfield to build a shop in Kindersley, Sk. We built this project as a Design Build for a basic shop to store tools and equipment in, the basic design was a 60’ x 80’ x 18’6” pre-engineered building which was inc...

IDC Corporate Office Renovation

The Inuvialuit Development Corporation has a 45,000 sf², three-floor office structure in Inuvik. Unfortunately, this building suffered extensive damage from a fire and the water used during fire suppression efforts. Nappaq, and Mid-West Design & Construction were contracted to completely renovate the existing space.

This work included the removal of damaged portions, restructuring of the building as well as creation and finishing of new office spaces. As the hub location for the IDC the corporate office is a vital piece of their infrastructure and therefore the timeliness in getting tenants back into the space was paramoun...
The Inuvialuit Development Corporation has a 45,000 sf², three-floor office structure in Inuvik. Unfortunately, this building suffered extensive damage from a fire and the water used during fire suppression efforts. Nappaq, and Mid-West Design & Construction were contracted to completely re...

Inuvik Regional Hospital

O.R. FLOORING REPLACEMENT

Nappaq, and Mid-West Design & Construction, in conjunction and SAHURI were contracted by Public Works to remove and reinstall the concrete floor system within the operating room in the Inuvik Regional Hospital.

The first stage of this work was to determine the cause of the flooring damage. A structural study was completed in conjunction with TRL & Associates Engineering, and the underlying issues were reviewed and understood prior to the work being completed. This report established operational strategies to ensure future monitoring and maintenance of the foundation systems to thereby...
O.R. FLOORING REPLACEMENT

Nappaq, and Mid-West Design & Construction, in conjunction and SAHURI were contracted by Public Works to remove and reinstall the concrete floor system within the operating room in the Inuvik Regional Hospital.

The first stage of this work was to...

Inuvik Community Centre

Nappaq and Mid-West Design & Construction were contracted to design and build a 10,000 sf². facility, spread
over two floors, as a community centre in Inuvik. The project, completed in 2014, was comprised of traditional
wood frame construction on an infill lot. The space was designed for a multitude of uses and addresses the
need within the community for meeting space, creative development, and continuing cultural exposure. Nappaq
and Mid-West designed the structure to tie in to the existing utilidor system. The highlight of the building’s
exterior is the inclusion of artwork that showcases the tra...
Nappaq and Mid-West Design & Construction were contracted to design and build a 10,000 sf². facility, spread
over two floors, as a community centre in Inuvik. The project, completed in 2014, was comprised of traditional
wood frame construction on an infill lot. The space was des...

Barnwell Water Treatment Plant

This 2870 sq.ft. Pre-Engineered Behlen Corr Span Dub’L steel building system was constructed in 2006 for the Town of Barnwell for their Water Treatment Plant.

This 2870 sq.ft. Pre-Engineered Behlen Corr Span Dub’L steel building system was constructed in 2006 for the Town of Barnwell for their Water Treatment Plant.

Blue Wave Energy Office-Shop Building

This project is completed through a Design, Build, Supply, Erect/Install form of contract with Southwest Design & Construction Ltd. and Swamp Donkey Oilfield Services Inc.  This 16,000 Square Foot building is the new home to Blue Wave Energy of Dawson Creek, British Columbia.

This new structure is comprised of a two story office, shop and wash bay complete with a full wall and ceiling liner package.

The building is constructed as a Pre-Engineered steel building complete with high efficiency 5” thick Nucor Insulated Roof panels and 4” thick Nucor Insulated Wall panels. 

This project is completed through a Design, Build, Supply, Erect/Install form of contract with Southwest Design & Construction Ltd. and Swamp Donkey Oilfield Services Inc.  This 16,000 Square Foot building is the new home to Blue Wave Energy of Dawson Creek, British Columbia.

Thi...

Bar XH Hangar Condo

Project Description: Airport Condo with 5 bays.

4 bays with 1— 50’ wide x 15’ high bi-fold door with a walk door and 4 – windows, the back walls have
1 – 12’ wide x 14’ high overhead doors, 1 -  walk door and a bronze tinted window and each bay is roughed in for a 3 piece water closet.

1 bay with 1 – 50’ wide x 20’ high bi-fold doors with a walk door and 4 – windows , the back walls have
1 – 12’ wide x 14’ high overhead doors, 1 -  walk door and a bronze tinted window and each bay is roughed in for a 3 piece wate...
Project Description: Airport Condo with 5 bays.

4 bays with 1— 50’ wide x 15’ high bi-fold door with a walk door and 4 – windows, the back walls have
1 – 12’ wide x 14’ high overhead doors, 1 -  walk door and a bronze tinted window an...

Black Velvet Distilling

This multi-stage large scale storage facility was completed in 2015 and allows for approx. 64,000 sq. ft. of additional warehousing for the client. The main structure is a pre-engineered steel building comprised of 2 cells separated by a 4 HR precast firewall. 

Adjacent to the main structure is a 400 sq. ft. self-framer constructed purposely to accommodate the main electrical & controls. The project delivery method was design-build turnkey and constructed in phases allowing the owner to utilize Cell # 1 while the 2nd cell was being completed. 

The design requirements of the project mandated FM Global standa...
This multi-stage large scale storage facility was completed in 2015 and allows for approx. 64,000 sq. ft. of additional warehousing for the client. The main structure is a pre-engineered steel building comprised of 2 cells separated by a 4 HR precast firewall. 

Adjacent to the main s...

Western Tractor

The main floor of this 32,000 sq. ft. pre-engineered steel structure is an industrial shop with cranes, retail, parts and service.  The second floor provides office and administration space.  The structure took 10.5 weeks to erect and enclose.
The main floor of this 32,000 sq. ft. pre-engineered steel structure is an industrial shop with cranes, retail, parts and service.  The second floor provides office and administration space.  The structure took 10.5 weeks to erect and enclose.

Dueck

The existing concrete block structure located at 2716 2nd Ave North, Lethbridge was in need of some maintenance and refinishing. Working in conjunction with the building owner the existing building was first insulated adding 2” of rigid insulation, gaining R15 to the existing building. The building was then cladded in 26 gauge material and finished with decorative banding, flashings and trim.

The entire process was completed while the multiple tenants of the building continued to work. This type of work can be completed under most any weather conditions since it is an improvement to the existing shell and does not compromise...
The existing concrete block structure located at 2716 2nd Ave North, Lethbridge was in need of some maintenance and refinishing. Working in conjunction with the building owner the existing building was first insulated adding 2” of rigid insulation, gaining R15 to the existing building. The bui...

All Class Fabrication

Southwest Design & Construction supplied and erected this 21,000 sq ft building for All Class Fabrication just north of Grande Prairie in the spring of 2016.
Southwest Design & Construction supplied and erected this 21,000 sq ft building for All Class Fabrication just north of Grande Prairie in the spring of 2016.

Nudura

This 105,520 sq ft facility located at the northeast corner of Coaldale, AB houses a high-tech manufacturing facility with warehouse & offices.

Both of the pre-engineered steel buildings have standing seam roof systems & the office annex features a perimeter parapet to give the appearance of a flat roof that also includes a cultured stone veneer.

The warehouse features a 2-bay receiving and an 8-bay loading dock and includes an expandable rigid frame endwall for ease of expansion in the future.
This 105,520 sq ft facility located at the northeast corner of Coaldale, AB houses a high-tech manufacturing facility with warehouse & offices.

Both of the pre-engineered steel buildings have standing seam roof systems & the office annex features a perimeter parapet to give the a...

Monsanto

Consisting of several contract formats and phases, this site now includes a large warehouse, product treating facility, maintenance shop, receiving bay, cleaning facility and an office and lab complex.

Over a period of nine years, Southwest has continually provided project management and general contracting services. Our history and track record with this client demonstrate our dedication to client focus and quality of service.
Consisting of several contract formats and phases, this site now includes a large warehouse, product treating facility, maintenance shop, receiving bay, cleaning facility and an office and lab complex.

Over a period of nine years, Southwest has continually provided project management and...

Pioneer Hi-Bred

Completed as a design-build construction management project along Highway 3 East of Lethbridge, near Coaldale. The project consisted of multiple phases over a 5-year period and is over 55,000 ft² in building area.
Completed as a design-build construction management project along Highway 3 East of Lethbridge, near Coaldale. The project consisted of multiple phases over a 5-year period and is over 55,000 ft² in building area.

Triple M Housing

This modular home manufacturing facility was recently expanded to increase the clients overall production, provide additional staff offices and washrooms, update the facilities existing paint applications and accommodate a need for additional material storage.

Completed as a design-build contract, each and every one of the client's needs were incorporated into the final design.

In addition to this project, Southwest Design & Construction Ltd. has also completed a 9,600 ft² (892 m²) cold storage building as well as an 11,520 ft² (1,070 m²) truss plant and welding shop.
This modular home manufacturing facility was recently expanded to increase the clients overall production, provide additional staff offices and washrooms, update the facilities existing paint applications and accommodate a need for additional material storage.

Completed as a design-build...

Hobgoblin Holdings Limited

This project incorporates three commercial warehouse bays ranging in size from 8,370 – 9,900 sf² and up to 29’ clear height. Each bay was developed to varying degrees, and different design specifications, however includes dedicated office space & washrooms.

The loading docks include dock levelers & dock seals, while a loading ramp provides access to the interior.
This project incorporates three commercial warehouse bays ranging in size from 8,370 – 9,900 sf² and up to 29’ clear height. Each bay was developed to varying degrees, and different design specifications, however includes dedicated office space & washrooms.

The loadin...

DuPont Pioneer Research Station

This remarkable, state of the art, hybrid corn research facility is located on a completely redeveloped 4-acre site just west of Coaldale, Alberta and is visible from Highway 3. The project was completed for a private land developer who truly believes in the importance of craftsmanship and quality.

Consisting of a 5,700 sf², exposed timber framed office building, fire rated link structure and 16,000 sf² warehouse building which incorporates a laboratory and refrigeration room, washrooms, mechanical and electrical room, equipment maintenance shop as well as shipping and receiving areas.

Once completed, DuPont Pi...
This remarkable, state of the art, hybrid corn research facility is located on a completely redeveloped 4-acre site just west of Coaldale, Alberta and is visible from Highway 3. The project was completed for a private land developer who truly believes in the importance of craftsmanship and quality.<...

Bayer Crop Sciences

Completed as a joint venture, this major project included a 53’ tall, 12,560 ft², pre-engineered steel building addition including office mezzanines, two full height and width firewalls, laboratories, packaging and production areas, washrooms, stairwells and warehousing areas. Additionally, portions of the existing plant had to be renovated to suit the expansion. The client also developed the lands immediately adjacent to significantly increase their commodity storage and processing capacities.

Working in conjunction with the owner and a pier in the construction industry, this project strengthened our relationships in ma...
Completed as a joint venture, this major project included a 53’ tall, 12,560 ft², pre-engineered steel building addition including office mezzanines, two full height and width firewalls, laboratories, packaging and production areas, washrooms, stairwells and warehousing areas. Additionall...

Debolt Fire Hall

The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.

The project was completed in December of 2016 by Southwest Design & Construction in Grande Prairie.
The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.

The project was completed in December of 2016 by Southwest Design & Construction in Grande Prairie...

Grovedale Fire Hall

Southwest Design & Construction in Grande Prairie completed the Grovedale Fire Hall in December of 2016.  The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.
Southwest Design & Construction in Grande Prairie completed the Grovedale Fire Hall in December of 2016.  The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad...

Highway 8 Emergency Centre

Completed through a lump sum contract with S2 Architecture, this two storey building is home to the Rocky View County Fire Department. Rocky View County Fire Department provides fire protection services to the Elbow Valley and Bragg Creek communities.

The newly constructed facility has accommodations to house 10-15 firemen. The facility includes two drive-thru bays to house fire trucks and equipment. The emergency centre features a modern kitchen, workout facilities, lounge area and meeting rooms.
Completed through a lump sum contract with S2 Architecture, this two storey building is home to the Rocky View County Fire Department. Rocky View County Fire Department provides fire protection services to the Elbow Valley and Bragg Creek communities.

The newly constructed facility has ac...