Project Portfolio: Fire Station

Debolt Fire Hall

The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.

The project was completed in December of 2016 by Southwest Design & Construction in Grande Prairie.
The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.

The project was completed in December of 2016 by Southwest Design & Construction in Grande Prairie...

Grovedale Fire Hall

Southwest Design & Construction in Grande Prairie completed the Grovedale Fire Hall in December of 2016.  The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad.
Southwest Design & Construction in Grande Prairie completed the Grovedale Fire Hall in December of 2016.  The 17,500 sq ft building features a 12″ thermal roof system, 4″ steel foam core wall panels, in-floor heating, hose drying/training towers and a STARS Air Ambulance helipad...

Highway 8 Emergency Centre

Completed through a lump sum contract with S2 Architecture, this two storey building is home to the Rocky View County Fire Department. Rocky View County Fire Department provides fire protection services to the Elbow Valley and Bragg Creek communities.

The newly constructed facility has accommodations to house 10-15 firemen. The facility includes two drive-thru bays to house fire trucks and equipment. The emergency centre features a modern kitchen, workout facilities, lounge area and meeting rooms.
Completed through a lump sum contract with S2 Architecture, this two storey building is home to the Rocky View County Fire Department. Rocky View County Fire Department provides fire protection services to the Elbow Valley and Bragg Creek communities.

The newly constructed facility has ac...

High Prairie Fire Hall

The 2012 renovation and addition to the new Fire Hall building in High Prairie, Alberta was completed within 8 months and included a hose tower, brass pole, new two-storey addition and high R-factor insulation.
The 2012 renovation and addition to the new Fire Hall building in High Prairie, Alberta was completed within 8 months and included a hose tower, brass pole, new two-storey addition and high R-factor insulation.

Kinuso Fire Hall

The 2012 construction of the new Fire Hall building in Kinuso, Alberta was completed within 6 months. This structure (building) is an example of a Nucor Straight Wall design.  This particular building boasts R20 walls and an offset A-Symmetrical roof.

This facility is comprised of two bays in the main building, a training tower, office space, locker room, washroom, mechanical room, etc.
The 2012 construction of the new Fire Hall building in Kinuso, Alberta was completed within 6 months. This structure (building) is an example of a Nucor Straight Wall design.  This particular building boasts R20 walls and an offset A-Symmetrical roof.

This facility is comprised of tw...

Manning Regional Fire Hall

The Manning Regional Fire Hall project included two individual and economically designed, pre-engineered steel building packages from Nucor Building Systems.

Building one is a two-story structure containing administrative offices as well as a kitchen whereas building two contains four drive-thru truck and apparatus bays and full mezzanine. The project also includes a strategically located 36-foot high hose drying tower.

The five-inch insulated panel roof and four-inch insulated walls from All Weather Insulated Panels (AWI) provide a highly efficient building envelope. The structural roof systems included are gable symmet...
The Manning Regional Fire Hall project included two individual and economically designed, pre-engineered steel building packages from Nucor Building Systems.

Building one is a two-story structure containing administrative offices as well as a kitchen whereas building two contains four dri...

St. Isidore/Three Creeks Fire Hall

Located in Northern Sunrise County Three Creeks, the construction of the new Fire Hall in St. Isidore was completed within eight months. The building dimensions are 61 feet wide by 110 feet long totalling 6,710 square feet of building area.

An example of a pre-engineered BEHLEN Corr?Span® this structure features four foot red accent banding, three foot stone veneer accent panels, high-R factor ceiling/walls and a flat roof line that is slightly sloped for drainage. The facility is comprised of administrative offices, a kitchen, meeting/training area, three bay truck shop, mezzanine and a 60-foot training tower complete with rep...
Located in Northern Sunrise County Three Creeks, the construction of the new Fire Hall in St. Isidore was completed within eight months. The building dimensions are 61 feet wide by 110 feet long totalling 6,710 square feet of building area.

An example of a pre-engineered BEHLEN Corr?Span&...